Preston Road Reconstruction — Plymouth, Connecticut

LEI provided route selection, roadway and hydraulic structure design, permitting (local, Connecticut DEEP and Army Corps of Engineers) and right-of-way (ROW) mapping for this 9,000-foot roadway reconstruction project. The selected route minimized impacts on neighboring residential properties and wetlands while maintaining earthwork balance, cost efficiency and appropriate horizontal and vertical alignments.

Design features include a widened roadway, intersection improvements, sidewalks, utility relocations, four large box culverts and wetlands loss mitigation. Design plans and ROW mapping were prepared in strict compliance with ConnDOT and FHWA requirements.

<